Skip to content
Okanagan AeroBarrier
AeroBarrier · Kelowna, BC

Kelowna's only authorized AeroBarrier installer.

Same-day envelope sealing for Kelowna builders. Pressurize at noon, pass blower door by dinner, document the result on Step Code paperwork.

100+
Homes sealed
100%
Blower-door pass rate
3·4·5
BC Step Code + Net Zero
1d
Typical site time

Why Kelowna builders pick AeroBarrier

Kelowna's high-end residential market — Lower Mission, Wilden, Kettle Valley, Lakeshore — is increasingly building to Step Code 4 and 5. Tape-and-caulk doesn't get you there reliably. AeroBarrier does. We pressurize the building, atomize a GreenGuard Gold-certified sealant, and watch the ACH50 number drop on screen until we hit your target. Then we hand you the report.

What we deliver in Kelowna

  • Single-day install — typically 6–8 hours on site
  • BC Energy Step Code 3, 4, and 5 air-tightness targets
  • Net Zero and Passive House-grade results when scoped
  • Documented blower-door pass — inspection-ready, rebate-ready
  • Coordinated with your trades — no drywall delays

Where we work in the Central Okanagan

Kelowna proper, including Lower Mission, Lakeshore, Glenmore, Wilden, Kettle Valley, Crawford Estates, Black Mountain, and University Heights. Plus West Kelowna, Lake Country, and the rest of the Central Okanagan. Same-day mobilization when scheduling permits.

Recent Kelowna results

  • 0.61 ACH50 — luxury build, post-drywall application (better than Passive House)
  • 0.35 ACH50 — homeowner project (same Brad Wendt result you'll see on the home page)
  • 2.2 → 0.5 ACH50 — mid-construction rescue for AuthenTech Homes

What it costs in Kelowna

Pricing depends on construction phase, target airtightness, and square footage. Most Kelowna single-family projects fall in a predictable range; multi-unit and custom estate builds we quote individually. Send us your project and we'll respond with a written quote within 24 hours.

Get a quote

Building in Kelowna or the Okanagan? Let's quote it.

Send plans, target ACH50, and construction phase. Written quote in 24 hours.