Step 4 rescue at final stage

Builder failed final blower-door at 4.1 ACH50 with occupancy a week away. Late-stage AeroBarrier with finish-grade masking dropped the envelope to 0.92 — Step 4 cleared.

Builder
Confidential
Target
≤ 1.5 ACH50 (Step 4)
Before
4.1 ACH50
Achieved
0.92 ACH50